Well I'd like to but I'm not sure if I'll get that far. With the 4th and then going over to the SRC - it's going to be tight.
I think I'm just going to use 4x4's or 2x6's and then 4x4's for the legs - simple design. Should only take 4 - 6 hours. The big thing is that the front of the tank will be about 12 - 18 inches into our living room and is about 6" higher than our garage floor. Need to get that perfectly level! Also I'll have to move my 65g to get the stand in place. Melev had to do the same thing so - I'll take a look at his site to get some hints.
|