Well after some running around figured out the plan for hard plumping (mostly) vectra m1 to reefer 250:
First shaved a mm from 3/4" sch 40 pvc as blue seat on vectra output is 19 mm.
The 3" pipe then connects up to a union, then a 1.75" pipe to a tee. From there we have a ball valve + female thread adapter than a male barbed 1/2 fitting to run gfo reactor. Up, we have another Union, a female threaded adaptor and another naked barbed 1/2" fitting which will soft connect the plumping to the reefer's return.
The total height of pluming and vectra is 21"
This is my first plumbing job so any tips would be appreciated - especially before I glue everything tomorrow