I finally got my Canon 6D back! Expect much better image quality from this post forward
Basement
Work has been slowly coming together on the rest of the build. The sump will be located in our unfinished basement. This gives me plenty of space for current equipment needs and expansion in the future.
I am still awaiting some critical pieces to arrive to complete the plumbing as well as some other equipment that has been ordered.
I attached some 1/2" ply to the concrete walls, and mounted the Apex, FMM and a raceway for cable management.
I began initial rough in of electrical as well, this will ultimately be a waterproof box, with 2 GFCI 20a circuits.
Heres some shots of the Tideline 48 sump and rest as it sits now: