I am building it mainly for the experience. So far it looks to be $105 for the sheet of acrylic and $10 for the Weld-on #4. I figure with all the mistakes I make plus the large tub I buy when I give up is should end up costing me about $500
Ok here is a total newbie question:
How do I determine what size bulkheads I have? Is it the size of the hole in the glass or the inside diameter of the bulkhead?