Back at it.. got the center post in to separate the cabinet doors. It is removable so I can get the sump in or out if needed. Also got the table top construction finished. Up next is doors and final finishing.
Got the apex running and connected to fusion.. been monitoring the temp in my garage all week and checking out the settings.
Rock still curing in the brute. Did a 5 gal water change on it today.
Sent from my SM-T820 using Tapatalk