Thread
:
Out of Africa (picture intensive)
View Single Post
10/21/2009, 05:35 PM
#
5
kinlayan
Registered Member
Join Date: Jul 2008
Location: Cape Town , South Africa
Posts: 822
Then it was time to fiberglass the interior. Some piping was already installed in the shuttering and concrete moulding process. For the fibreglass i did 6 coats with matting to make sure i didnt have any pinhole leaks.
kinlayan
View Public Profile
Find More Posts by kinlayan