My Next Move (Will be a Double Move) SUMPS OUT (Will speed everything up for Quality Sump Room Work)
So I decided waste some time to think Next Steps....and ran a new 110Volt wire for the future Electrical Sump Room Circuit. That helped me think about next steps.
Working in that Sump Room Build is tight.
Dust covers to prevent dust going into Sumps, and just no access to all walls (that I want to seal Water Tight this time)
And that can't be done in piece part for a Good SEAL.
So I'm going to move out BOTH SUMPS (Out of Sump Room).
The Far Kitchen TANK SUMP one ijust a swing around the Wall. Hoses are cord will reach No Problem. (DRAIN, LIFT, MOVE, FILL)
The Near Sump for the OLD 65 Gallon is a bit more work (with wires) from Apex.
But there is space right next to the tank.
If I achieve the DOUBE SUMP move, things so go much faster, and quality work too.