Thank you all for your responses. I had already ordered all of the parts that I need for this, but was questioning my decision. I will have the Eclipse M overflow, bulkheads, diamond hole saws, dill bit guide, and lockline returns tomorrow, and plan on drilling the tank as soon as they arrive.
The plan is to place the overflow on the middle of the tank with 2 returns (one on either end of the back wall). This should be an easy enough project, assuming I don't break the tank in the process. haha
__________________
Current tank: 40B work in progress w/20L sump
|