View Single Post
Unread 07/07/2018, 01:38 AM   #35
spiritwalker
Registered Member
 
Join Date: May 2018
Posts: 52
Despite the sweltering So Cal heat, which my Apex (running in the garage) measured at a peak of 107*, I got a lot done today.

I got some holes drilled in the back of the cabinet as well as into the electronics area for the return pump line and cord routing. Got the sump in place and will be hanging the carbon/gfo reactor high on the back wall probably over the fuge. I've got about 7" of width remaining for an ATO resivour which I still need to source.

I need to get a 4.5" he cut in the back for an exhaust fan.





Sent from my SM-G950U using Tapatalk


spiritwalker is offline   Reply With Quote