View Single Post
Unread 04/27/2006, 06:00 PM   #16
ChemE
Registered Member
 
ChemE's Avatar
 
Join Date: Aug 2005
Location: East Nashville, TN
Posts: 1,607
OK, lets do this thing.

Post a list of all your equipment that is adding heat to the tank as well as how long it runs per day. From this we can determine how much heat you need to reject to the Ti coil which is also how much heat your geothermal loop needs to reject to the ground. Both of which are very easily calculated (I'll post the calcs). I think you'll be surprised how little flow rate you need to make this happen.


__________________
Holding it down on the engineering tip y'all

Current Tank Info: 190G
ChemE is offline   Reply With Quote